Installation of an anaerobic and aerobic working wastewater treatment plant for a meat-processing corporation in the Caribbean

A leading corporation in the food industry in the Dominican Republic decided in 2018 to build a new wastewater treatment plant for one of their meat-producing facilities in the heart of the island.

- Hydraulic plant capacity: 800 m3/d

- Organic Load: 3400 kg/d (COD)

- Year of construction: 2018

A well-known local producer of meat and meat products wanted to achieve his strict in-house environmental standards and decided to erect a new wastewater treatment plant. The existing treatment plant became too small and was running faulty due to production increases in the past.

The client decided in close collaboration with CUSS engineers for a procedural combination of mechanical pretreatment and anaerobic plus aerobic treatment:

High amounts of solids are removed in a first filtration step with a drum screen. In a following step, additional floating particles were separated in a dissolved air flotation together with chemical coagulation and flocculation.

The pre-screened wastewater is then pumped to the anaerobic treatment in a Upflow Anaerobic Sludge Blanket (UASB) reactor to degrade the majority of the dissolved organics by using granular biomass. A side product in the anaerobic process is biogas which is directly flared off to minimize negative impact on the environment.

The rest of the dissolved organics, nitrogen and phosphorus containing wastewater is finally treated in three Sequencing Batch Reactors to achieve the required threshold values.

A chlorination channel was already foreseen during the design phase due to potentially higher microbiological standards in the future. This predictive planning allows the client to reach increased standards with a minimum of additional investment costs. 

Our well-experienced, multilingual supervisors were coordinating all mechanical and electrical installation together with a team of workers from our client.

The commissioning as well as the operational service over several month was performed by our competent process engineers which allowed a safe and defined start-up phase and a successful acceptance test.

To the press compartment of CUSS Chriwa Umwelt-Systemtechnik /

Downloads to this press release

The online press boxes are a joint service provided by Koelnmesse GmbH and NEUREUTER FAIR MEDIA GmbH. The companies publishing the press releases in each case are responsible for the content of the press releases. They shall indemnify Koelnmesse GmbH against any claims by third parties arising in connection with the use of the online press boxes. This exemption shall apply in particular to infringements of copyright and trademark law. It remains in effect even after the press release concerned has been removed from the online press boxes.